Cretzmeyer Track Hammerthrow Field

The University of Iowa Cretzmeyer Track Hammerthrow Field
105 1st Avenue
Coralville, Iowa

MBA was the General Contractor for this project. The problem for this project was the area is low and prone to flooding. The scope of work included – leveling the ground in the throw area; remove and replace hammer throw circle and adjoining concrete; install 4” collector tile; install 4’ diameter sump pit, 8’ deep; remove 12” of dirt in a 60’ x 50’ area in front and under the hammerthrow circle; laser grade sub-grade to drain into collector tile; install filter fabric and then place 500’ of 2” x 12” Advantage tile to drain to collector tile; install 1” clean ballast over tile and filter fabric; place 3” layer of pea gravel over ballast; repair hammer throw cage; trenching electric lines; and installing a concrete electrical pole for sump pump.